Kitchen remodel scope of work
Rooms or areas: Kitchen
Demolition
Remove the cabinets, counters, sink, and backsplash this scope replaces.
Remove the kitchen flooring, or leave it if this scope says the floor stays.
Protect adjacent rooms and the path the crew will use.
Framing
Open, remove, or add the walls named here, and list the walls that stay.
Add blocking for upper cabinets, a hood, or a new opening, where the plan needs it.
Electrical
New or moved circuits for appliances, the disposal, and lighting, named here.
The hood duct path, and whether the hood vents outside or recirculates.
Plumbing
The sink, dishwasher, and disposal stay on the same lines or move, as written here.
The gas range and gas line stay or move, as written here. Say if the range is electric.
Fixtures
The sink and faucet, or an allowance, and who buys them.
Appliance models or cutout sizes, and who orders and receives them.
Finishes
Cabinet layout and finish, or an allowance that names a quantity.
Counter material and edge, or an allowance.
Backsplash material and height, or an allowance.
Flooring material, and how the new floor meets the floor outside the kitchen.
Paint or other wall finish inside the kitchen.
Permits and inspections
Who applies if your building department requires a permit, who pays the fee, and where the permit number is written before work starts.
Which inspections, if the department requires any, have to happen before the work is covered up.
Cleanup
Daily cleanup of the work area.
Haul-away of debris, and where a dumpster or trailer may sit.
How the work area is left at the end, including dust and leftover materials.
Who buys materials
A list of what you buy and what the contractor buys.
Who receives, stores, and installs items you supply, and what happens if one arrives damaged.
Allowances
Each allowance names the item, the quantity, and a dollar amount.
How a selection over or under the allowance is priced, in writing, before the item is ordered.
Schedule and milestones
A start date and a completion date for this scope.
The milestones that have to finish before the next part of the work starts.
Payment tie-ins
Which payment is tied to which milestone.
The final payment is tied to a completed punch list.
Warranty
Any labor warranty in writing: what it covers and for how long.
Who keeps the manufacturer warranties for materials the contractor supplies.
Exclusions
Repair of hidden damage found after demolition is not included until you and the contractor agree in writing.
Work outside the rooms or areas named in this scope is not included.
This is a draft you can send so contractors price the same work. It is not a contract and not a permit decision. Check with your local building department before work starts. For a dispute, talk with an attorney.