Bathroom remodel scope of work
Rooms or areas: Bathroom
Demolition
Remove the vanity, toilet, and shower or tub this scope replaces.
Remove the tile and other finishes in the wet area.
Protect the rest of the house and the path the crew will use.
Framing
Open or move the walls named here, including a niche or a wider doorway.
Blocking for the vanity, a grab bar, a niche, or a glass panel.
Electrical
The fan, the lights, and any new circuit this scope includes.
A heated floor or a new fan duct, if this scope includes one, and where the duct exits.
Plumbing
Which fixtures stay on the same drains and which ones move.
The shower valve location, and whether the shower drain moves.
Fixtures
The toilet, or an allowance, and who buys it.
The vanity, top, and faucet, or allowances, and who buys them.
The shower or tub fixture, including the valve, or an allowance.
Finishes
The waterproofing product and where it goes, before tile.
Tile locations, and who buys the tile.
The bathroom floor material.
Paint and any wall finish outside the tile.
Permits and inspections
Who applies if your building department requires a permit, who pays the fee, and where the permit number is written before work starts.
Which inspections, if the department requires any, have to happen before the work is covered up.
Cleanup
Daily cleanup of the work area.
Haul-away of debris, and where a dumpster or trailer may sit.
How the work area is left at the end, including dust and leftover materials.
Who buys materials
A list of what you buy and what the contractor buys.
Who receives, stores, and installs items you supply, and what happens if one arrives damaged.
Allowances
Each allowance names the item, the quantity, and a dollar amount.
How a selection over or under the allowance is priced, in writing, before the item is ordered.
Schedule and milestones
A start date and a completion date for this scope.
The milestones that have to finish before the next part of the work starts.
Payment tie-ins
Which payment is tied to which milestone.
The final payment is tied to a completed punch list.
Warranty
Any labor warranty in writing: what it covers and for how long.
Who keeps the manufacturer warranties for materials the contractor supplies.
Exclusions
Repair of hidden damage found after demolition is not included until you and the contractor agree in writing.
Work outside the rooms or areas named in this scope is not included.
This is a draft you can send so contractors price the same work. It is not a contract and not a permit decision. Check with your local building department before work starts. For a dispute, talk with an attorney.