Whole-home remodel scope of work
Rooms or areas: Rooms in this scope
Demolition
The rooms this scope opens, and what is removed in each.
Rooms that have to stay livable, and how they are protected.
Framing
Walls, openings, and other framing this scope includes, listed by room.
Electrical
Electrical work by room: circuits, lighting, and any panel work.
Plumbing
Plumbing by room: fixtures that move, and new supply or drain lines.
Fixtures
Fixtures and appliances this scope includes, or an allowance for each.
Finishes
Finishes by room: flooring, paint, tile, cabinets, and counters.
Where a new finish has to meet a finish that stays.
Permits and inspections
Who applies if your building department requires a permit, who pays the fee, and where the permit number is written before work starts.
Which inspections, if the department requires any, have to happen before the work is covered up.
Cleanup
Daily cleanup of the work area.
Haul-away of debris, and where a dumpster or trailer may sit.
How the work area is left at the end, including dust and leftover materials.
Who buys materials
A list of what you buy and what the contractor buys.
Who receives, stores, and installs items you supply, and what happens if one arrives damaged.
Allowances
Each allowance names the item, the quantity, and a dollar amount.
How a selection over or under the allowance is priced, in writing, before the item is ordered.
Schedule and milestones
A start date and a completion date for this scope.
The milestones that have to finish before the next part of the work starts.
Payment tie-ins
Which payment is tied to which milestone.
The final payment is tied to a completed punch list.
Warranty
Any labor warranty in writing: what it covers and for how long.
Who keeps the manufacturer warranties for materials the contractor supplies.
Exclusions
Repair of hidden damage found after demolition is not included until you and the contractor agree in writing.
Work outside the rooms or areas named in this scope is not included.
This is a draft you can send so contractors price the same work. It is not a contract and not a permit decision. Check with your local building department before work starts. For a dispute, talk with an attorney.