Basement finishing scope of work
Rooms or areas: Basement
Demolition
What this scope removes in the basement, and what stays.
Protect the stairs and the finished rooms above.
Framing
New walls, doors, and a ceiling, if this scope includes them.
Window or door openings this scope adds or changes. Ask the building department before framing a bedroom.
Electrical
New circuits, lights, and outlets this scope adds.
Whether the electrical panel or a subpanel is part of this scope.
Plumbing
Plumbing this scope adds, including a bathroom or a wet bar, and which drains are new.
A sump pump or sewage ejector, if the plan needs one. Confirm it with the building department.
Fixtures
Bathroom fixtures this scope includes, or a note that there is no new bathroom.
Interior doors and hardware this scope includes.
Finishes
Insulation this scope includes. Confirm the approach with the building department.
Drywall, the ceiling finish, and paint.
The basement floor material.
Permits and inspections
Who applies if your building department requires a permit, who pays the fee, and where the permit number is written before work starts.
Which inspections, if the department requires any, have to happen before the work is covered up.
Cleanup
Daily cleanup of the work area.
Haul-away of debris, and where a dumpster or trailer may sit.
How the work area is left at the end, including dust and leftover materials.
Who buys materials
A list of what you buy and what the contractor buys.
Who receives, stores, and installs items you supply, and what happens if one arrives damaged.
Allowances
Each allowance names the item, the quantity, and a dollar amount.
How a selection over or under the allowance is priced, in writing, before the item is ordered.
Schedule and milestones
A start date and a completion date for this scope.
The milestones that have to finish before the next part of the work starts.
Payment tie-ins
Which payment is tied to which milestone.
The final payment is tied to a completed punch list.
Warranty
Any labor warranty in writing: what it covers and for how long.
Who keeps the manufacturer warranties for materials the contractor supplies.
Exclusions
Repair of hidden damage found after demolition is not included until you and the contractor agree in writing.
Work outside the rooms or areas named in this scope is not included.
This is a draft you can send so contractors price the same work. It is not a contract and not a permit decision. Check with your local building department before work starts. For a dispute, talk with an attorney.