Minneapolis Building Permit Lookup
Community Planning and Economic Development · Checked 2026-11-15.
Community Planning and Economic Development's building permits page says a building permit is the legal permission to start construction, and that officials approve the plans before the permit is issued. Minneapolis Development Review is the office named on the page.
The same page links work the city treats as exempt. Read that list on the city's site. The general list below is not a substitute for it. Confirm your scope with Development Review.
Verify this with the department before you start work. Rules change, and two houses in the same city can fall under different rules. This is general information, not a permit determination and not legal advice.
Does my remodel need a permit?
General guidance, not a decision for your house. Confirm the scope with the department before anyone opens a wall.
Work that usually needs a permit
- Work that changes the structure, such as removing or moving a wall, adding a room, or converting a garage.
- New or relocated plumbing, electrical, or mechanical work, including a panel, new circuits, or moving a drain or a gas line.
- Cutting a new window or exterior-door opening.
- A deck, an addition, or a change to the roof structure.
Work that often does not, but still ask
- Painting, patching drywall, and replacing flooring.
- Swapping cabinets or fixtures in the same place when you are not moving plumbing or wiring.
- Other cosmetic work that does not change the structure, the exits, or the building systems.
Common questions
- Where do I look up a Minneapolis building permit?
- Open the Community Planning and Economic Development link on this page and read the record there. A permit number on a bid is not the record until that official page shows it.
- Does my Minneapolis remodel need a permit?
- Ask Community Planning and Economic Development. The typical-work list on this page is general guidance, and it is not the department's decision for your house.
Keep the permit with the bid
One room is free. The project holds the scope, the permit notes, and the payment schedule together.
Start your free project