The useful record is the one you build while the walls are open, not the folder you wish you had on the last day. Photos, signed changes, and proof of payment are ordinary papers. They are also what you will want if a price moves, a pipe leaks, or you sell the house later. What to file after the dust settles is in what to keep after a remodel. This page is the habit during the job.
Before anyone swings a hammer
- Photos of each room, dated. Include the corners, the floors you might keep, and anything you have asked them not to touch. A phone photo with the date in the file name is enough.
- The scope you sent out, and every bid that came back. Keep the date you received each one. Comparing them later is in how to compare contractor quotes.
- The signed contract, the day you sign it. The Texas Attorney General says to get and keep copies of everything you sign at the time you sign it (Texas AG). Do not leave the only copy on the contractor's tablet.
- The license lookup and the insurance certificate. Write the date you checked them. The steps are in check the license and insurance.
Keep the scope, the changes, and the payments in one project. One room is free.
Start a free planKeep the file with the job
Save the changes, the receipts, and the photos in one project. One room is free.
Start your free projectWhile the work is open
Photograph the work after demolition and again before anything is closed up. Those frames are the record of what was in the wall. If the city inspects, save the result and the date, not only a text that says it passed. Who was supposed to schedule that inspection belongs in the permit notes. See what to confirm about permits.
When the price, the date, or the scope changes, the change has to become a piece of paper. California's Contractors State License Board says a change to the price or the scope must be a written change order, signed by you and the contractor before the change (CSLB). A message that agrees to the change is worth saving, and it is not a substitute for the signed order. Save the message out of the text thread: a screenshot or a forwarded email, with the date. The order itself is covered in change orders.
Money, matched to paper
Keep each invoice next to the payment that covered it, and keep proof of the payment. A text that says "paid" is weaker than a receipt, a card record, or a canceled check. How you pay is in cash, Zelle, or card. The week-to-week budget is in track remodel receipts and spending.
If a payment is supposed to come with a lien waiver, file the waiver with that payment, not in a pile at the end. See lien waivers. Allowance choices belong here too: the product, the price you accepted, and the change order if you went over. See allowances.
The IRS says to keep receipts and similar records for improvements that add to your home's basis. What that means, and how long Publication 530 says to keep them, is in home improvement cost basis. This page does not tell you what you can deduct.
This is general information, not tax advice. Talk to a tax professional about your situation.
At the end, do not start over
The punch list, the final inspection if the job needed one, the warranties, and the model numbers should land in the same file. The closeout steps are in final payment and the punch list. If a payment is tied to a phrase like substantial completion, read the contract's definition before you treat the job as done. That phrase is in what substantial completion means.
RenoBinder keeps the budget, the change orders, and the receipts with the project. When you mark the project complete, the finishes stay in a record you can still read. One room is free. Home Record+ ($19/yr) keeps that record editable and emails you before a warranty runs out. See pricing.
One room is free. A Project Pass ($49, 12 months) covers every room and adds receipt forwarding, a partner seat, and CSV and PDF exports. See pricing.
Start a free plan and keep the file with the job →This is general information, not legal advice. Rules vary by state; for a dispute, talk to a licensed attorney or your state contractor board.
Keep the file with the job
Save the changes, the receipts, and the photos in one project. One room is free.
Start your free projectLaunch offer: 30% off with code LAUNCH30