Who buys the materials?
This is general information, not legal advice. Rules vary by state. Check your state's licensing board before you hire, and talk to a licensed attorney about a dispute.
Updated 2026-11-21
The contract should say who buys each product, who stores it, and who calls the manufacturer if it arrives damaged or fails. If the bid only says tile or fixtures, you do not yet know the product or the price.
An allowance is a placeholder amount for an item you have not picked. The allowances guide explains how those lines work. The allowance calculator checks a pick against the allowance. This page does not set a markup and does not tell you which arrangement is cheaper.
If you buy it
Owner-supplied means you purchase the product. Ask the questions below in writing. Do not assume the contractor's warranty includes a product they did not buy, and do not assume it excludes it. The contract should say.
- The bid says the contractor will install owner-supplied items, or it says they will not.
- You know where the product will be stored and who is responsible if it is stolen or broken before installation.
- You know who calls the seller or the manufacturer if the product is defective.
- You know what happens if it does not fit the opening.
- The warranty sentence in the contract mentions owner-supplied items on purpose.
If the contractor buys it
A specified product is different from an allowance. If you have not chosen the item, the bid should say it is an allowance and what the allowance includes. A change from that allowance belongs in a change order before anyone buys it.
- The bid names the product or labels the line as an allowance.
- You know the date you must finish the selection so the schedule still holds.
- A substitution is in writing, with the price difference, before the purchase.
- You ask for the receipt or the supplier invoice you will need for a warranty or for your own file.
- You can line the allowances up across bids in the quote comparison tool.
Related hiring guides
Guides already on this site
Tools and permit pages
- Compare contractor quotes
- Allowance overage calculator
- Order-by calculator for long-lead items
- Remodel document checklist
- Contractor license lookup by state
- Check whether a project usually needs a permit
- Building permit lookup for 299 US cities
- Do I need a permit?
- Remodel checklists
- What to confirm about a remodel permit
Keep the hire in RenoBinder
Keep bids, contracts, permits, and receipts for this project in RenoBinder. One room is free.
Start your free projectCommon questions
- Should I buy my own remodel materials?
- Either way can be written into the contract. If you buy them, ask who stores them, who warranties them, and whether the contractor will install them. If the contractor buys them, ask which lines are specified products and which are allowances. Get the answer in the bid.
- What is an allowance on a contractor bid?
- It is a placeholder amount for something you have not selected yet. The allowances guide walks through how those lines behave. Compare them across bids so a low allowance does not make one quote look cheaper.
- Who warranties materials the contractor did not buy?
- The contract should say. Do not guess. Ask who calls the manufacturer, and keep that sentence with the receipts.